Grab Rail installed now ready to Go

Grab Rail
This is only a note from our log.  We will update with more info later.

Installed 1 grab bar.. Lost one of the ends to the ocean so had to get another. Replaced Heat Exchanger zinc… was about 1/2 way done figured might as well. filled Outboards gas.. gallon 1.5.. about a week at Vero Beach Marina.

Got Thoughts?